| Filename | Latest commit message | Latest commit date |
|---|---|---|
There are more than 1 interaction inside verifySetupPlatformVpn. The original code does not actually wait for the target interaction with Executor.schedule(). The interact may happen after reset the mocking object. This will leave a unexpected interaction in the follow up verification and cause a flaky test. This test was fine in the initial patch, but becomes failed after the time unit used in Executor.schedule() was changed to milliseconds for data stall recovery. Both interactions for data stall ones and non-data stall ones will be captured together after that. Bug: 289961869 Test: atest VpnTest --rerun-until-failure 20 Change-Id: If24e323b366bb15b81fe9fa554fa7ccc852ba6f1 |
||
| .. | ||
| internal/net | ||
| server | ||